Bristol & surrounding areasUrgent help? Call 7am–10pm, 7 days

For renovations & extensions · Bristol

Electrical work
for Bristol renovations.

Electrical work for Bristol renovations and extensions, planned around the room layout, the existing installation and the wider build programme.

Speak directly with Max about the job, access and the basis of the quote.

House rewiring in progress, with chased cable routes, recessed socket back boxes and lifted floorboards

Choose your starting point

Where are you in the renovation?

Make decisions while they are still straightforward to change.

Your next step

I am planning the layout

Mark furniture, equipment and electrical points before first-fix routes are agreed.

Get a rewire quoteYou can add more details before sending your request.

Plan around your property

Plan the electrics before building work starts.

Open the topics that apply to your job. You can discuss anything still undecided when you enquire.

Discuss my renovation
01

Where do you need lights and power?

Set positions around furniture, appliances and everyday use.

Mark furniture, appliances, work surfaces and the places where switches will be used. Settle positions and intended equipment before the first-fix routes are installed.

02

Can the existing circuits support the work?

Assess the installation before adding to it.

An extension or room refurbishment may connect new work to existing circuits. The condition, protection and suitability of that installation need consideration alongside the new brief.

03

When does the electrician need access?

Coordinate first fix, fitting dates and final connections.

First fix needs access before finishes close up. Second fix and final connection need the room, fittings and equipment ready. Share the builder’s programme and any undecided products early.

04

Who supplies fittings and makes good?

Agree responsibilities with your builder and other trades.

Confirm who supplies fittings, handles extraction ducting, moves furniture, lifts floors, repairs plaster and decorates. A complete build includes work outside the electrical quotation.

05

What happens before the job is finished?

Allow for testing, certification and the handover.

Allow time for final checks and relevant certification. The installation should be ready for proper testing before the renovation is treated as complete.

See relevant PB Electrical workCompleted electrical work and what was involved.
Full kitchen rewire following damp-proofing works.
Full kitchen rewire following damp-proofing works.

Work by PB Electrical

Kitchen rewire after damp-proofing.

Planning similar work? Tell Max which rooms you are changing and what you want to install.

What to send with your enquiryA short checklist for the first conversation.

Prepare your enquiry

Start with what you know.

You do not need a complete technical specification. These details help Max understand the job before the next conversation.

Get a rewire quote

For the first conversation

  • Room plans and electrical point positions
  • Appliance and equipment specifications
  • Trade programme and access dates
  • Agreed responsibility for making good

Have a drawing, photo or report? Attach it in your email app. Leave electrical covers in place.

Practical answers

Questions before you book.

When should I contact the electrician?

At the planning stage, before the layout and build sequence make routes difficult to change. Final positions and equipment information are needed before installation.

Ask Max about this
Can you coordinate electrical work with our builder or kitchen fitter?

The electrical work can be planned alongside your builder or fitter. Use the same current room drawing, confirm the appliance specifications and agree access for first fix and final connections. Nominate the person who approves positions and any changes during the build.

Ask Max about this
Do I need a full rewire for one renovated room?

Not automatically. The existing installation and proposed work need assessment before deciding between local alterations, new circuits or wider replacement.

Ask Max about this
What should be decided before electrical first fix?

Settle the room layout, appliance specifications, socket and switch positions, lighting groups and control requirements. Identify any outstanding choices before routes are installed. Share the plan with the builder and fitter so structural work, units and finishes leave access for the agreed electrical installation.

Ask Max about this
Does the renovation electrical quote include making good?

Ask for floor lifting, room clearance, cable chases, plaster repairs and decoration to be assigned explicitly. They may be included, excluded or handled by other trades. Confirm the sequence and handover points so final fitting and testing can happen without relying on unfinished preparation.

Ask Max about this
Useful electrical guidesAnswers for the work you are planning.

Get the job started

Discuss your renovation.

Share the postcode, what you need and any dates or access arrangements. Max can discuss the appropriate next step.

Speak directly with Max · 7am–10pm, seven days. For urgent help, please call.

PB Electrical Our work