Bristol & surrounding areasUrgent help? Call 7am–10pm, 7 days

Business premises · Bristol & surrounding areas

Commercial EICR & fixed wire testing
in Bristol.

A commercial EICR reports on the condition of your premises’ fixed electrical installation. Agree the areas covered, access and planned power interruptions before booking. Share your previous report and any landlord or insurer deadline so the inspection can be scoped for the building you use.

Speak directly with Max about the premises, access and work you need.

Electrical inspection at a consumer unit

Choose your starting point

What is prompting the inspection?

Choose the closest option. You can add the details of your premises and any different requirements before sending your enquiry.

Your next step

Our existing report is due for review

Share the last EICR, its recommended next inspection date and any changes made since it was issued.

Get a commercial EICR quoteYou can add more details before sending your request.
What the service includesDefine the work needed at your premises.

Define the work

Define which installation the report will cover.

A business address can contain more than one tenancy, board or responsible party. Establish the boundaries before the inspection.

01

Your unit and shared supplies

Identify the rooms, floors and outbuildings included in your request. Explain whether the building owner controls a shared intake or any distribution equipment. Access to the space you occupy does not automatically include access to every part of the supply, so those arrangements need to be confirmed when planning the inspection.

02

Existing drawings and circuit information

Previous reports, installation certificates and circuit schedules help describe the premises before attendance. Send complete documents where available, including test schedules and observations. Mention extensions, added equipment or altered rooms since the previous inspection, so the discussion reflects the installation that is now in use rather than an outdated layout.

03

The written condition report

An EICR records the assessed condition and any observations within the agreed inspection scope. It is not a quotation for repairing every finding. Ask Max to explain the outcome, any urgency and what needs a separate investigation or remedial quotation, rather than treating the report as an automatic pass certificate.

Plan around your businessAccess, equipment and keeping the premises running.

Keep the premises in mind

Plan the power interruptions before people arrive.

Testing needs coordination with the people who run the premises, not just a date in the diary.

Name the person who can authorise a shutdown

Choose a contact who understands how the building is used and can approve the practical arrangements. In leased premises, this may involve your landlord or managing agent as well as your own team. Confirm who holds keys and who can arrange access to electrical cupboards before the inspection date.

Identify equipment that cannot stop unexpectedly

Flag servers, tills, access systems, refrigerated stock and other equipment affected by a loss of supply. Agree the shutdown and restart responsibilities with the people who manage those systems. Raising this in advance helps define a workable inspection sequence and any limits that must be discussed before the work proceeds.

Allow for occupied and restricted areas

Tell Max about meeting rooms, customer appointments, high shelving and locked areas. Some parts of the installation may require furniture to be moved or a space to be vacated. Discuss whether work can be phased, and how any access restrictions would affect the extent recorded in the report.

How to arrange the workFrom the first discussion to an agreed job.

From first contact to agreed work

Know the next step.

You can enquire before every detail is settled. The work, access and price are agreed before booking.

  1. Send the available records

    Share the premises details, reason for inspection and any complete previous report. Include your deadline, opening hours and the contact responsible for access to electrical equipment.

  2. Agree inspection arrangements

    Discuss the extent, limitations, likely interruptions and quotation. Confirm approvals, room access and how affected staff or occupants will be informed before attendance is arranged.

  3. Review the outcome

    Keep the report and schedules together. Discuss observations, their urgency and any follow-up work, then decide how remedial tasks or further investigation will be authorised.

Prepare for a commercial quoteThe premises details and records to share.

Prepare for a useful quote

Send the details
that shape this job.

Use this checklist if you have the information to hand. You can still enquire if you do not have drawings or previous electrical records.

Read the preparation guide

Your commercial eicr & fixed wire testing enquiry

  • Business address, postcode and areas to be inspected
  • Last EICR with schedules and any installation records
  • Reason for the report and any requested deadline
  • Number of boards if known, without opening covers
  • Critical equipment, opening hours and shutdown contact
Get a commercial EICR quote

Attach plans or reports to your prepared email. Leave electrical covers in place when taking photographs.

Practical answers

Questions about commercial eicr & fixed wire testing.

Is fixed wire testing the same as a commercial EICR?

Fixed wire testing is commonly used when requesting the inspection and testing recorded in a commercial EICR. It concerns the fixed installation rather than portable appliances. If a landlord or insurer has requested a document, provide the wording so the agreed inspection matches that requirement.

Ask Max about this
Can the building remain open during the inspection?

It depends on the installation, occupancy and the testing arrangements. Some areas may remain in use while other circuits need a planned interruption. Discuss business-critical equipment and opening hours before booking. The extent and any limitations must be agreed rather than assuming the whole inspection can happen without disruption.

Ask Max about this
How often should a commercial EICR be carried out?

The interval depends on the installation, its use, condition and relevant requirements for the premises. Review the previous report and any changes or deterioration since it was issued. Tell Max about requests from your insurer or landlord; a single standard interval should not be assumed to fit every business.

Ask Max about this
Does the quote include repairing an unsatisfactory report?

Inspection and remedial work are separate scopes unless expressly agreed otherwise. The findings determine what needs attention and whether further investigation is necessary. Ask for a clear explanation of the observations and a quotation for defined follow-up work, including access, interruptions and the appropriate completion records.

Ask Max about this
Can you inspect just the part of a building we rent?

Explain the tenancy boundary and which circuits or boards serve your space. Shared supplies and landlord-controlled areas may affect access and the inspection extent. Max can discuss what can be agreed once the available records and permissions are understood. Ask the managing agent for the relevant documents early.

Ask Max about this
What information is needed to quote for commercial fixed wire testing?

Send the premises use, floor areas, distribution board count, previous EICR and any circuit schedules. Explain operating hours, restricted rooms and equipment requiring planned shutdowns. If the previous report excluded parts of the installation, identify whether those areas now need to be included.

Ask Max about this
Do we need to shut down servers and refrigeration for an EICR?

Flag those systems before the inspection is booked. Testing involves interruptions, and their shutdown, protection and restart arrangements need agreement with the responsible people. Do not assume that an occupied-building inspection allows every circuit to stay energised or that the electrician manages your IT systems.

Ask Max about this
Connected commercial servicesExplore other work your premises may need.
Related guides and projectsRead more if you are planning connected work.
Electrical safety guidance

For the safety and maintenance principles behind this advice, read:

Talk to Max

Get a commercial EICR quote.

Tell Max what you need, where the premises are and any date you are working towards.

PB Electrical Our work