Bristol & surrounding areasUrgent help? Call 7am–10pm, 7 days

Business premises · Bristol & surrounding areas

Commercial fit-out electrics
in Bristol.

Power and lighting for a new business layout, planned around the installation already in the unit. Agree equipment positions, retained circuits, wiring stages and handover with PB Electrical. Bring the current drawings and landlord requirements into the plan before ceilings and partitions are finished.

Speak directly with Max about the premises, access and work you need.

Empty commercial premises during an electrical fit-out with enclosed socket trunking

Choose your starting point

Where are you in the fit-out process?

Choose the closest option. You can add the details of your premises and any different requirements before sending your enquiry.

Your next step

Reviewing a unit before work starts

Share the premises details and proposed business use. Existing electrical records and landlord restrictions help identify what needs checking before a layout and installation scope are settled.

Get a fit-out quoteYou can add more details before sending your request.
What the service includesDefine the work needed at your premises.

Define the work

Give the fit-out a defined electrical brief.

A unit’s previous use may differ from yours. Plan what the new business needs before treating the existing sockets, lighting or circuit arrangement as a finished solution.

01

Power and equipment positions

Mark the reception, work areas, displays, storage and staff facilities on one current drawing. Add the equipment each location will use and any manufacturer requirements already available. This allows power points and cable routes to be discussed around a coordinated layout rather than a collection of separate requests from different trades.

02

Lighting and controls by area

Identify the activities in each part of the premises and when those areas will operate. A customer-facing space, working area and store can need different fitting positions and control zones. Decide which products are specified and which require selection so the quote does not rely on unresolved lighting allowances.

03

Existing installation and retained circuits

A fit-out does not necessarily mean every cable is replaced, but retained parts need appropriate assessment for the proposed work. Share existing reports and explain what the landlord or previous tenant is leaving. Agree what is being retained, altered or replaced so responsibility and scope are clear before ceilings and walls close.

Plan around your businessAccess, equipment and keeping the premises running.

Keep the premises in mind

Align approvals, trades and the opening date.

An opening target is useful, but the electrical sequence also depends on permission, access and the readiness of the surrounding building work.

Lease and landlord responsibilities

Check who controls the incoming supply, distribution equipment and shared areas. Obtain the landlord’s requirements for alterations and handover before the work is agreed. If another contractor is undertaking landlord works, identify the boundary between their installation and your fit-out so tasks are not missed or priced twice.

First fix, finishes and second fix

The building programme should show when routes are accessible and when partitions, ceilings and joinery will be completed. Wiring and final fitting do not necessarily happen together. Share revisions promptly and agree how changes will be authorised, particularly if furniture or equipment choices move a connection after the first stage.

Completion and premises records

Allow time in the programme for the agreed electrical testing, any outstanding items and a clear handover. Identify who receives circuit information and the relevant certification for the work. Equipment commissioning and other building systems may have separate providers, so confirm how their readiness relates to your planned opening date.

How to arrange the workFrom the first discussion to an agreed job.

From first contact to agreed work

Know the next step.

You can enquire before every detail is settled. The work, access and price are agreed before booking.

  1. Review the fit-out brief

    Send your postcode, proposed use and latest drawings, with equipment requirements and the intended programme. Include existing electrical reports and landlord conditions so the discussion starts with the premises you are taking on.

  2. Set scope and stages

    Max discusses assessment, retained wiring, proposed power and lighting, and access alongside other trades. Agree the installation boundaries, products, programme assumptions and price before the electrical work is committed to your fit-out.

  3. Complete and hand over

    Electrical work follows the agreed stages and is tested before handover. Keep the relevant records with the building information and clarify any outstanding tasks with the responsible trades before opening the premises.

Prepare for a commercial quoteThe premises details and records to share.

Prepare for a useful quote

Send the details
that shape this job.

Use this checklist if you have the information to hand. You can still enquire if you do not have drawings or previous electrical records.

Read the preparation guide

Your commercial fit-out electrics enquiry

  • Premises postcode, intended use and whether the unit is empty
  • Latest floor plans and proposed power and lighting positions
  • Equipment schedule with installation requirements where available
  • Existing reports, landlord conditions and division of responsibilities
  • Building programme, access dates and target opening date
Get a fit-out quote

Attach plans or reports to your prepared email. Leave electrical covers in place when taking photographs.

Practical answers

Questions about commercial fit-out electrics.

Can you quote before we have a complete fit-out drawing?

You can start the conversation with a proposed use, rough layout and premises details. A firm scope needs enough information about equipment, lighting and access to define the work. Max can discuss what is missing and any assessment needed, helping you develop the electrical brief before final decisions are made.

Ask Max about this
Do new business premises need a complete rewire?

That cannot be decided from the fact that a business is moving in. The condition of the existing installation and the requirements of the new use both matter. Share available reports and the proposed changes so retained circuits, alterations and any replacement wiring can be assessed and scoped for the actual premises.

Ask Max about this
Can you work alongside our builder and kitchen or shop fitter?

Coordination starts with one current layout and a programme showing access for each trade. Identify the person who can approve electrical positions and changes, and make clear what other contractors are supplying. Max can discuss the proposed stages and attendance so the electrical work fits the wider build rather than an assumed sequence.

Ask Max about this
Who needs to approve electrical changes in a rented unit?

Check your lease and the landlord’s requirements before committing to alterations. Shared supplies, distribution equipment and building access can involve more than the tenant’s occupied space. Provide those conditions and any landlord-contractor scope with your enquiry so the electrical quotation reflects the approved boundary and the access that will actually be available.

Ask Max about this
When should we arrange the electrical work for a planned opening?

Bring the electrician into the layout, equipment and trade programme before access routes close. Share the target opening date when enquiring, then agree stages around approvals, site readiness and other contractors. Allow for final connections, testing and handover before the premises need to open.

Ask Max about this
What electrical information should we request before taking a new unit?

Ask the responsible party for the existing EICR, installation certificates, circuit schedules and details of any limitations or outstanding work. Compare those records with your proposed equipment and layout. The existing electrical condition and your fit-out requirements are separate questions that both need consideration.

Ask Max about this
Which electrical decisions must be fixed before first fix starts?

Settle the room layout, equipment positions, socket and lighting points, controls and connection requirements. Identify any choices still provisional and the effect of later changes. Agree routes and trade responsibilities before partitions or finishes conceal them, and reserve time for final testing and handover.

Ask Max about this
Connected commercial servicesExplore other work your premises may need.
Electrical safety guidance

For the safety and maintenance principles behind this advice, read:

Talk to Max

Get a fit-out quote.

Tell Max what you need, where the premises are and any date you are working towards.

PB Electrical Our work